DUE TO THE WORLDWIDE COVID EPIDEMIC, THERE HAS BEEN AN UNPRECEDENTED NUMBER OF FACTORS AFFECTING OUR BUSINESS.
1. MASSIVE SHORTAGES OF HARDWOOD AND SOFTWOOD LUMBER, DUE TO REDUCED LOGGING AND SAWMILL OPERATIONS, WILL CONTINUE THROUGH 2021
2. LACK OF LONG HAUL TRUCKS AND DRIVERS AND INCREASED DIESEL FUEL COSTS HAVE SIGNIFICANTLY INCREASED FREIGHT EXPENSES (almost double from a year ago) AND IS RESPONSIBLE FOR EXTENDED LEAD TIMES TO RECEIVE MATERIAL.
3. LACK OF ENOUGH CONTAINERS AND CONTAINER SHIPS HAVE SIGNIFICANTLY INCREASED COSTS (more than double from a year ago) AND IS RESPONSIBLE FOR EXTENDED LEAD TIMES TO RECEIVE MATERIAL. (3 times greater than a year ago)
Because of these factors, prices on all our flooring products are changing constantly. Please contact Derr Flooring to confirm your current cost and to check availability. We are doing everything possible to keep our selling prices in-line and to offer alternatives if some products are out of stock and have extended lead times.
*** Due to the increase in fuel costs and fleet operations Derr Flooring effective 12-1 will increase their delivery charges to $75.00 for warehouse/store shipments and $150.00 for jobsites***
***Showroom visits are by appointment only. Please click "Schedule Showroom Visit" to select branch location and time.***